Geosynchronous Satellites

KOUROU SPACE CENTRE, FRENCH GUIANA - MARCH 2014: Astra 5B is prepared for integration into the Ariane 5 fairing (nose-cone) in the cleanroom of the Fairing Integration Area. The last major step in the launch campaign is Ariane 5's transfer by rail to the 90-meter-tall Final Assembly Building. It is inside this facility that the launcher receives its payload, along with the Sylda structures, and the payload fairing. These payload elements are processed within an encapsulation hall inside the Final Assembly Building. The payload is then hoisted by a traveling crane and transferred for installation atop the launcher. The launch table's umbilical mast is fitted with a 20-meter extension, which includes connections for the payload fairing's air-conditioning system. The EPS upper stage and the launcher's integrated attitude control system are fuelled in the final assembly building. When integration activity in the Final Assembly Building is finished, the mobile launch table with its completed launcher is rolled out to the Launch Zone (ZL). This step occurs about 12 hours before launch. (Photo by Toby Smith/Getty Images)
KOUROU SPACE CENTRE, FRENCH GUIANA - MARCH 2014: Astra 5B is prepared for integration into the Ariane 5 fairing (nose-cone) in the cleanroom of the Fairing Integration Area. The last major step in the launch campaign is Ariane 5's transfer by rail to the 90-meter-tall Final Assembly Building. It is inside this facility that the launcher receives its payload, along with the Sylda structures, and the payload fairing. These payload elements are processed within an encapsulation hall inside the Final Assembly Building. The payload is then hoisted by a traveling crane and transferred for installation atop the launcher. The launch table's umbilical mast is fitted with a 20-meter extension, which includes connections for the payload fairing's air-conditioning system. The EPS upper stage and the launcher's integrated attitude control system are fuelled in the final assembly building. When integration activity in the Final Assembly Building is finished, the mobile launch table with its completed launcher is rolled out to the Launch Zone (ZL). This step occurs about 12 hours before launch. (Photo by Toby Smith/Getty Images)
Geosynchronous Satellites
ARQUIVO RESTRITO
Esta imagem não pode ser licenciada online. Para licenciar esta imagem, entre em contato conosco.
undefined

DETALHES

Restrições:
Contate o escritório local para todos os usos comerciais ou promocionais.Special pricing applies.
Crédito:
Toby Smith / Colaborador
ID Editorial:
1077244836
Coleção:
Reportage Archive
Data da criação:
11 de março de 2014
Data do upload:
Tipo de licença:
Info sobre autorização:
Sem autorização Mais informações
Fonte:
Reportage Archive
Nome do objeto:
img_20140311-1140.jpg
Tamanho máximo do arquivo:
3725 x 5587 px (31,54 x 47,30 cm) - 300 dpi - 10 MB