Aerial view of pipeline laying operations for the Gazprom PJSC Power of Siberia gas transmission line between the Kovyktinskoye and Chayandinskoye gas fields near Irkutsk

Aerial view of pipeline laying operations for the Gazprom PJSC Power of Siberia gas transmission line between the Kovyktinskoye and Chayandinskoye gas fields near Irkutsk, in Kirensk, Irkutsk Oblast, Russia, April 5-6, 2021. Built by Russian energy giant Gazprom, the pipeline runs about 3,000 kilometers (1,864 miles) from the Chayandinskoye and Kovyktinskoye gas fields in the coldest part of Siberia to Blagoveshchensk, near the Chinese border.
Aerial view of pipeline laying operations for the Gazprom PJSC Power of Siberia gas transmission line between the Kovyktinskoye and Chayandinskoye gas fields near Irkutsk, in Kirensk, Irkutsk Oblast, Russia, April 5-6, 2021. Built by Russian energy giant Gazprom, the pipeline runs about 3,000 kilometers (1,864 miles) from the Chayandinskoye and Kovyktinskoye gas fields in the coldest part of Siberia to Blagoveshchensk, near the Chinese border.
COMPRAR UMA LICENÇA

Informe quando, onde e como deseja usar este arquivo para receber ofertas de preço personalizadas.

DETALHES

Restrições:
Para qualquer uso comercial, entre em contato com seu representante local da Getty Images.
ID Editorial:
1312200681
Coleção:
Bloomberg
Data da criação:
05 de abril de 2021
Data do upload:
Tipo de licença:
Direitos prontos
Info sobre autorização:
Sem autorização Mais informações
Duração do clipe:
00:00:15:12
Local:
Kirensk, Irkutskaya oblast', Russia
Masterizado em:
QuickTime 10-bit ProRes 422 Standard HD 1920x1080 29.97i
Fonte:
Bloomberg Video RR
Nome do objeto:
clip120835_06_20210412